Freedom, GEABSOLUTE POWERS CORRUPT ABSOLUTELY, General Election (GE15), Malaysia, Politics, polling Nov 19: Destroy Umno for the betterment of Malaysia, race, religion, Solidality, support Aliran for Justice

Share This

Showing posts with label leaking pipes. Show all posts
Showing posts with label leaking pipes. Show all posts

Tuesday 25 July 2017

The stalled building defects causing delays of relocation ..

Not ready: (Clockwise from top) The front view of the Batu Ferringhi market in Penang, exposed electrical sockets and cracked floor in the badminton court, and a leaking pipe in the washroom.


Defects causing delay of move to RM9mil Batu Ferringhi market


The scheduled relocation of traders to the RM9mil Batu Ferringhi market on Aug 14 is postponed to a later date until shortcomings such as leakage in the washrooms and cracks on the floor are fixed.

Lim checking on the condition of the market.- Photos: ZHAFARAN NASIB/The Star

SENIOR officers of the Penang Island City Council (MBPP) were left red-faced after Chief Minister Lim Guan Eng spotted several defects in the almost completed RM9mil Batu Ferringhi market during a site visit.

Lim, who was irked with the shortcomings, asked his officers to collect back copies of his text speech given earlier to reporters.

“Before I came in, I went to the washroom. I thought it would be ready.

“But the male washroom was locked and I had to use the unoccupied ladies washroom instead.

“If the market is considered ready (by the council), then it is unacceptable,” he said.

Washroom with missing taps

 
A leaking pipe pipe in the washroom

It is learnt that the ladies washroom was leaking and some of the taps had yet to be fixed.

Lim, who was walking to the dining area, was stopped by several traders who requested the council delay their relocation into the market which was earlier scheduled on Aug 14.

Speaking to newsmen, Lim said another date would be set.

“We cannot fix a date now until we are satisfied that the shortcomings have been rectified,” he said.

MBPP mayor Datuk Maimunah Mohd Sharif said she would hold discussions with the market contractor and architect.

“Cracks have also appeared on the floor of the badminton courts,” she said.


Maimunah said the council had issued the Certificate of Practical Completion (CPC) for the market but not the Certificate of Completion and Compliance (CCC).

The market was scheduled for completion by the end of last year.

There are 16 hawker stalls, 28 wet and dry market units, a multipurpose hall, a library, three badminton courts, playground, bicycle path, shower rooms and 90 parking bays.

Source: The Star/ANN by Intan Amalina Mohd Ali

Related Link:

Residents: Removed plants were well maintained - Community 

Related posts:

Wall and awning collapsed in house near construction site 

 

Errant hill clearing by developers causes of flood, sinkholes, seepages damaged houses!

Sunday 9 October 2016

Water corruption, an integrity crisis is disruptive, debilitating, damaging and hurting us

Water Corruption | SSWM http://www.sswm.info/content/water-corruption

The Star Says: A crisis of integrity and a lesson to be learnt


THE country’s gaze is fixed on the alleged corruption in the Sabah Water Department, following the arrest of two of its senior officers.

How can it not be when the Malaysian Anti-Corruption Commission (MACC) displayed at a press conference on Wednesday the cash, cars and luxury goods found in the duo’s homes and offices?

If a picture is worth a thousand words, imagine how much power there is in photographs of items worth tens of millions of ringgit.

And the numbers that the case has yielded so far are dizzying.

The MACC has seized about RM57mil in cash, nine cars (estimated value is RM3mil), 19.3kg of gold jewellery (RM3.6mil), almost 100 handbags (RM500,000) and 127 land title deeds.

The commission has also frozen bank accounts with balances totalling RM60mil.

It is certain that more assets will be uncovered as the probe deepens and widens.

There are additional figures to digest.

The MACC has discovered that the department had given contracts to 38 companies owned by family members and proxies of the two senior officers.

These contracts were awarded for projects funded by the Federal Government. In total, RM3.3bil was set aside for the projects.

The Star reported yesterday that 60 sen out of every ringgit thus allocated was pocketed by many individuals.

We marvel at the size of the MACC’s haul and we are outraged by the extent of the apparent theft of government funds, but we should also take note of another set of numbers.

According to 2015 statistics from the National Water Services Commission, which is better known as SPAN, 87.9% of Sabah’s population has treated water supply.

Only Kelantan has a lower water coverage (64%), although SPAN explained that many households in Kelantan relied on alternative water sources.

At the national level, 95.5% of the population has water coverage.

Sabah did just as poorly in the handling of non-revenue water (NRW), which is the difference between the water that comes out of the treatment plants and the water for which consumers are billed.

The gap is due to theft, leakage, burst pipes, faulty meters and maintenance works.

Last year, Malaysia’s NRW rate was 35.5%. Sabah’s rate was 55.1%, which again placed the state as second from the bottom.

Perlis was slightly worse, with 56.3%.

Yes, Sabah is large, and its rural communities are dispersed. But the same can be said about Sarawak, which has performed better in these areas of water supply management.

Whichever way you look at it, Sabah cannot claim to have a sparkling record in providing water to the people and in taking care of the water infrastructure. And now we can think of many million reasons why this is so.

The MACC investigations probably have some way to go, and if it leads to people being charged in court, a lot more will have to happen before the Sabah Water Department case can be put to rest.

Nevertheless, this is also a time for a compelling case study on how corruption directly hurts us.

Here is a great example of why we should all fight corruption. Underestimate its impact, and we may one day be left high and dry. Let us not waste this learning opportunity.

We have lately been fretting about being hit by a water crisis, but we should also understand that an integrity crisis is just as disruptive, debilitating and damaging. The Star Says

Related posts:

Water fiasco: RM114 million seized from Sabah water officials 

https://youtu.be/01stOYgM9x0 It was a record haul by the Malaysian Anti-Corruption Commission – RM114mil seized from two top officer...


No water but officials flush with funds: abuse of power, nepotism, cronyism, bribery and money laundering

Jabatan Air Negeri Sabah - http://malaysianlogo.blogspot.my/2014/06/jabatan-air-negeri-sabah-sabah.html KOTA KINABALU: Everywhere in Sab...


 Jabatan Air Negeri - Customer Service How the millions were stolen? 1. Contracts broken down to small packages of RM100,000 ea...


PBA in a fix over Penang water cut; billion litrea Water waste via leaky pipes 
 Jabatan Air Negeri - Customer Service How the millions were stolen? 1. Contracts broken down to small packages of RM100,000 ea...

Wednesday 21 September 2016

PBA in a fix over Penang water cut; billion litres water waste via leaky pipes

Water letdown: Residents waiting for their pails to be filled by a PBAPP employee during the water cut.

Buckets of frustrations

Delay in repairs on a leaking pipeline at Medan Pantai Jerejak causes a host of problems for folk in the southern part of Penang island as unexpected water cuts disrupt their daily activities.



Users left high and dry as rain delays repair works on leaking pipeline


MORE than 80,00 people from Bukit Dumbar to the southern areas of Penang island were fuming over the delay in the return of water supply.

A reader called The Star claiming that he could not get through to the Penang Water Supply Corporation Sdn Bhd (PBAPP) hotline for an explanation after the water supply to his condominium was cut off on Monday morning.

Peter Lee, 58, a manager, said his friends in Batu Uban faced a similar problem.

Housewife K.L. Lim, 63, from Sungai Nibong said her family ran out of drinking water and had to buy water from shops.

“We did not stock up on water since we did not know about the matter. There is still water for showers but not enough for drinking,” she said.

At SJK (C) Kwang Hwa in Jalan Sultan Azlan Shah, Sungai Nibong, the water disruption resulted in the school using water from fire hydrants in the school premises.

A representative from the school said the water cut began on Monday afternoon and only resumed at 1pm yesterday.

“We needed water for the toilets and canteen.

“We had to use pails to collect water from the three fire hydrants in the school to deal with the disruption until the water supply resumed,” said the representative.

During a press conference that was also attended by state Works, Utilities and Transportation Committee chairman Lim Hock Seng, PBAPP chief executive officer Datuk Jaseni Maidinsa apologised for the water disruption.

He said PBAPP detected a leak on a 900mm diameter pipeline at 9am on Monday at a river crossing at Medan Pantai Jerejak, near Sungai Besar.

The pipeline was then shut down for repair work, and a cofferdam built quickly to isolate the repair site.

Jaseni said they were ready to proceed with the repairs on the pipe at 9.45pm on Monday and had expected work to be completed by about 6am on Tuesday but “work was held up by 10 hours due to the heavy rain, high river water and high tides”.

“The welding work to reseal the leaking section of the pipeline could only commence after the site was finally drained at 7.45am on Tuesday.

“The challenge was to gain access to the leaking section of the pipeline overnight. We managed to meet the standard requirement by finishing the work in about 29 hours, as we are allowed up to 48 hours for repairs to pipes that are more than 600mm in diameter.

“It would have taken us only 19 hours without the delay, and we apologise to consumers. On-site work has been finalised and water supply should resume from 2pm,” he said at Komtar yesterday.

Jaseni said four water tankers were deployed to provide water to residents living on higher grounds.

He said PBAPP optimised the pumping of water from Bukit Dumbar via the two other key pipelines to all the southern areas of the island, including the Bayan Lepas Free Trade Zone and the Penang International Airport during the shutdown period.

It was reported that a new RM11.9mil water station at Bukit Dumbar could pump up to 270 million litres of water per day (MLD) to serve 315,000 people living in the southern parts of the island.

Its service areas cover Gelugor, Batu Uban, Sungai Nibong, Bayan Baru, Relau, Sungai Ara, Batu Maung, Bayan Lepas, Permatang Damar Laut, Teluk Kumbar, Gertak Sanggul, Genting and Balik Pulau.

By CHONG KAH YUAN and N. TRISHA kyuan@thestar.com.my

Billion litres water waste via leaky pipes



PETALING JAYA: More than 4.27 billion litres of treated water – enough to fill more than 1,700 Olympic-sized swimming pools or keep Perlis going for 53 days – are leaking out of the country’s ageing pipe system every day.

Experts warn that more will be wasted unless drastic measures are taken.

If saved, that amount of water could ease stressed water supplies in the Klang Valley, as fears of a shortage and rationing loom dangerously.

According to the National Water Services Commission (SPAN), non-revenue water (NRW) accounted for 36.6% of all water pumped out of treatment plants in 2013, or about 5.69 billion litres a day.

This was higher than 2012, which saw a 36.4% NRW.

Of this amount, at least 75% was due to problems like leaky asbestos-cement pipes and other infrastructure problems.

Association of Water and Energy Research (Awer) president S. Piara­pakaran said that unless the pipes were fixed, more water would be lost even with state governments rushing to build treatment plants to meet a growing local demand.

“When the Langat 2 plant is completed (in 2017), it will pump 1,130 million litres a day (mld). If things don’t change, 300mld will be just lost in the system,” he told The Star.

While a number of states have seen their NRW levels fall in 2013, others such as Selangor saw more water lost.

Malaysian Water Association (MWA) president Syed Mohamad Adnan Alhabshi said more than RM20bil had to be spent to replace the country’s 43,890km-long asbestos-cement pipes.

“You need to spend RM500,000 to change 1km of these pipes,” he said, adding that state governments did not have the money.

He said water operators were unable to invest in stopping NRW as tariffs were low, giving them low revenue.


This was also reflected in SPAN’s statistics – a deficit of RM429mil was incurred by all states combined last year.

MWA council member Hairi Basri said it was not easy to stop NRW as many of the problem pipes were underground.

MWA further estimated that if the country were to keep to SPAN’s NRW target of 25% today, the potential revenue operators could have made in 2013 was RM809.4mil.

SPAN executive director Mohd Ridhuan Ismail said combating NRW was more than just fixing or replacing leaky pipes.

Measures, he said, included mapping pipe networks, setting up district metering zones and a constant pressure management and maintenance of the system.

“It is not a one-off effort and the entire exercise requires huge investment,” he told The Star.

He said state governments were hampered by low water tariffs and could not invest in NRW reduction measures, adding that human capital in this was also a challenge.

Mohd Ridhuan said many states had migrated their assets over to the Water Asset Management Com-pany (PAAB) to ensure their interests were protected.

He said states that had done so had managed to reduce their NRW substantially.

“SPAN believes that the remaining non-migrated states will be able to improve on their NRW once migrated,” he said.

 By Patrick Lee The Star 4 September 2014

Related story:

Worst affectedstates trying to contain the problem

No cost hike for Pahang-Selangor water project

Paper on new national policy for NRW almost ready

Syabas uses new technology to detect leaks





Related posts:


Jan 14, 2016 ... Rightways: Penang Forum concerns over hill clearing and floods ... Dec 13 ... Errant hill clearing by developers causes of flood, sinkholes,.

Sep 14, 2015 ... Massive flood water from IJM Trehous construction project next to Bukit Jambul Hill pond is now flooded, overflown, diverted and entered visibly ...


 Errant hill clearing by developers causes of floods, sinkholes, seepages damaged houses!