Freedom, GEABSOLUTE POWERS CORRUPT ABSOLUTELY, General Election (GE15), Malaysia, Politics, polling Nov 19: Destroy Umno for the betterment of Malaysia, race, religion, Solidality, support Aliran for Justice

Share This

Showing posts with label roads. Show all posts
Showing posts with label roads. Show all posts

Saturday, 15 July 2017

Stop denying the undeniable high engineering consultancy fees for 3 Penang roads, says minister

The works minister, Datuk Seri Fadillah Yosof says compared to what the JKR recently paid for pre-construction consulting fees for a project in Johor (RM19mil of pre-construction consulting cost represents 2.67% of RM718,570,500 for roads totalling 30km in length), the Penang government's consultancy fees for the three roads project is exorbitant to the total RM220mil pre-construction fees that was already fully paid by the Penang government, which represented 11.06% of the RM1.99bil construction cost for the three roads totalling 20km in length and has yet to start construction despite a three-and-a-half-year delay.” 


PETALING JAYA: The Penang government has been urged to “stop denying the undeniable” over the exorbitant consultancy fees for the three roads project.

Works Minister Fadillah Yusof said the Public Works Depart­­ment (JKR) recently paid RM19 million in total for pre-construction consulting fees for a paired road highway project in Jo­­hor.

He compared this with the exorbitant consultancy fees for the three roads project in Penang.

“The fees comprise all required services and include the fees for all surveys, soil investigation, preliminary environmental impact assessment and all civil, structural, electrical and mechanical designs,” The Star quoted Fadillah as saying.

He said the RM19 million of pre-construction consulting cost represents 2.67% of RM718,570,500 for roads totalling 30km in length.

He added that in accordance with the Board of Engineers Malaysia’s (BEM) guidelines, not all of the fees for the project were paid before construction began as a quarter of the payment was withheld for the tendering and construction stages.


“Compare this to the total RM220 million pre-construction fees that was already fully paid by the Penang government, which represented 11.06% of the RM1.99 billion construction cost for the three roads totalling 20km in length and has yet to start construction despite a three-and-a-half-year delay,” Fadillah said.

The three paired roads are meant to be the traffic dispersal system of Penang’s proposed undersea tunnel project.

The cost of the consultation fees for the three paired roads has been a point of contention between the state and federal government, whereby the latter says that the Penang government has significantly overpaid the fees.

The Penang government has maintained that the fees paid is not excessive. - FMT news, The Star

Related Links:

Stop denying the undeniable, says Fadillah - Nation

 

Parti Cinta hands 'evidence' of graft to MACC over tunnel project - Nation 

 

PCM lodges report over Penang undersea tunnel project - Nation ...

 

Party plans to renew MACC report on Penang undersea tunnel project ...

 

BNSC: Firm given Penang Tunnel project 'undercapitalised' - Nation ...

 

Penang Undersea Tunnel - Wikipedia

 

CM: Penang undersea tunnel feasibility study can't proceed | Free ...

 

Making the corrupt fear whistleblowers, not the other way !

Bumpy road ahead for CZBUCG's RM6.3b project - The Edge Property

 

Auditors qualify opinion on accounts of firm tasked with Penang tunnel ...

 

Gerakan questions 'high profits' of tunnel feasibility study contractor ...

 

PDF]PENANG MAJOR PROJECTS PRESENTATION - ENGLISH ...

 

Making the corrupt fear whistleblowers, not the other way !

 


Related post:

Dismayed over the exorbitant engineering consultancy fees, 4 times higher !