Freedom, GEABSOLUTE POWERS CORRUPT ABSOLUTELY, General Election (GE15), Malaysia, Politics, polling Nov 19: Destroy Umno for the betterment of Malaysia, race, religion, Solidality, support Aliran for Justice

Share This

Showing posts with label waters. Show all posts
Showing posts with label waters. Show all posts

Tuesday, 11 January 2022

Chang'e-5 in-situ data proves presence of water on moon

 

Picture of the cube-shaped "mystery hut" taken by Yutu-2 rover. Photo: Courtesy of Beijing Aerospace Control Center

 

Data acquired by the lander of China's Chang'e-5 lunar probe has provided the first-ever evidence of the in-situ detection of water on the moon, indicating that there is as much as 120 parts per million of water (as hydroxyl and/or H2O) in the lunar regolith. Space analysts said Sunday that this fresh discovery of a key resource on the moon is great news for humanity's endeavor to build and operate research stations and even migration to Mars.

` A joint research team led by Lin Yangting and Lin Honglei from the Institute of Geology and Geophysics of the Chinese Academy of Sciences made observations of the water signals in reflectance spectral data from the lunar surface collected by the Chang'e-5 lander, and their study was published in Science Advances, a peer-reviewed multidisciplinary open-access scientific journal run by the American Association for the Advancement of Science, on Saturday.

` Scientists said in the published work that water on the moon "is mostly attributed to solar wind implantation."

` Before this, many orbital observations and sample measurements completed over the past decade have found evidence of the presence of water (as hydroxyl and/or H2O) on the moon. However, no in-situ measurements were previously conducted on the lunar surface. The Chang'e in-situ measurement filled this gap.

` Song Zhongping, a space analyst and TV commentator, told the Global Times the existence of water could support human survival on the moon and help generate fuel for spacecraft such as rockets.

` That would mean the moon's resources could facilitate humanity's exploration of deeper space. The moon could also be a great springboard for human migration to Mars, Song pointed out.

` Carrying some two kilograms of lunar samples, China's Chang'e-5 safely landed at a designated landing site in Siziwang Banner of North China's Inner Mongolia Autonomous Region on December 17, 2020, marking a full victory for the first lunar sample return mission since the Soviet Union's Luna 24 mission in 1976.

` Lin said that the Chang'e-6 and -7 missions will continue to search for water on the moon, and their studies would lay the ground for future missions' scientific goals.

` Wu Yanhua, a deputy administrator with the China National Space Administration (CNSA), recently disclosed that state authorities have approved the fourth phase of China's lunar missions, which will include new Chang'e-6, -7 and -8 missions, which are expected to be carried out in the next decade.

` China plans to launch the Chang'e-7 probe to the lunar South Pole first, which will be followed by the Chang'e-6 for a sampling and return mission from the lunar South Pole.

` Chang'e-8, the last piece of the fourth phase, will construct a primary form of the International Lunar Research Station.

` Meanwhile, the Global Times learned from the CNSA that the Chang'e-4's rover Yutu-2 had trekked more than 1,000 meters on the moon's surface as of Thursday.

` According to mission insiders, the cube-shaped "mystery hut" on the far side of the moon the rover spotted last month has turned out to be a rabbit-like rock. On the 38th moon day of the moon expedition, Yutu-2 advanced right toward the rock to see it up close.

` After getting closer and getting some perspective, and with the guidance of the ground supporting team, the rover was able to reveal the object's true nature with the full-color camera onboard.

` The Yutu-2 and Chang'e-4 lander took pictures of each other on January 11, 2019, marking the full success of the mission, and the latest stage of the rover took place just before the third anniversary of that epic feat.

` Many netizens commented online that it was such a sweet and romantic moment, that China's "jade rabbit" rover could finally meet its mate on the moon. 

 Source link

 

RELATED ARTICLES
 

 

 

 

China's Chang'e-4 spacecraft, a world's first mission to moon's far side, boosts Beijing a space superpower

China successfully completes lander tests, preparing for Mars mission in 2020 as it pushes for inclusion in global space projects

China unveils its 2020 Mars probe

 

 

China lands on far side of the moon

 

 

 

China successfully launches 1st Mars probe

Live: China's inaugurates first Mars exploration mission Tianwen-1 in southern Hainan Province

Monday, 22 October 2018

Soil erosion mitigation plans ignored, waters from stream identified as main cause !

A drone picture of the collapsed beams along Jalan Tun Sardon leading to Balik Pulau on the left while Jalan Paya Terubong on the right leads to Relau.— CHAN BOON KAI/The Star
(Above) A closer view of the collapsed beams. (Right) The affected section of the project overlooking Jalan Paya Terubong heading to Relau in the background.
 
Tragic Situation: (Top) A landslide at the construction site in Jalan Bukit Kukus, Paya Terubong, caused four containers to be covered with mud - Bernama,  Closed call:(Right below) Survivors of the landslide surveying the scene



 Checks show projects did not follow SOP 


GEORGE TOWN: As the search and rescue operation for seven buried foreign workers at a construction site in Paya Terubong is going on, shocking information has surfaced that not a single construction site in Penang is following the soil erosion mitigation plan stipulated in their project approvals.

The Star has learnt that the state government has launched Ops Lumpur shortly after the general election, requiring enforcement officers from the local councils to inspect and report on every construction site in all five districts in the state.

A consultant civil engineer familiar with Ops Lumpur claimed that every single construction project did not observe the soil erosion mitigation plan.

He said Ops Lumpur was overseen directly by state exco members and enforcement officers were required to visit the sites.

"Their reports shocked the state exco members. Every contractor failed to do soil erosion measures in every site.

“Now you know why streams near construction site are always yellow when it rains,” he said.

The consultant engineer said the state went after developers who claimed they were not aware and blamed the contractors.

“Civil engineers are often disgusted when they do site visits because it is common for us to see that the soil erosion mitigation plans are never followed,” he said.

The consultant said it was easy to inspect construction sites and check on the progress and questioned whether state government agencies regularly conducted scheduled and surprise visits.

“How often do they conduct spot checks? How strictly do they conduct enforcement rounds on construction sites? If we keep contractors on their toes all the time, we might not have so many landslides,” he said, referring to the latest landslide in Bukit Kukus, the site of a hillside highway from Paya Terubong to Bukit Jambul is being built.

A teh tarik-coloured stream was observed flowing between Jalan Paya Terubong and the barred entrance to the highway construction site yesterday.

It has been raining almost every day in Penang this week.

In yesterday’s incident, rescue team found one survivor and two dead bodies. At press time, seven are still missing.

The Fire and Rescue Department received a distress call about the landslide at 1.56pm.

An Indonesian worker who only wished to be known as Endo, 36, said three of his relatives from Sulawesi were trapped in the landslide and he was working in another nearby construction site.

“It rained all night (Thursday). The rain stopped at 9am (yesterday) and resumed at 1pm. At my site, all of us stayed in our quarters and didn’t work because of the rain.

“I got a call from others that my relatives are missing. So, now I’ll just wait,” he said.

Last Thursday, 14 concrete beams measuring 25m long each, crashed down from an elevated section of the highway.

No injuries were reported and a stop-work order was issued pending investigations of the collapse.

Chief Minister Chow Kon Yeow, who visited the site with several state exco members, said he reminded rescue workers to be wary while searching for the missing victims because the rain could have rendered the slopes unstable.

“All work has stopped here and the contractor was about to send in its report on the collapse of the concrete beams on Oct 11,” he said, adding that the place where the beams collapsed was far from the landslide. - The Star by arnold lohlo tern chern

Water from stream identified as main cause of landslide


GEORGE TOWN: Water flow from a stream on the hilly area in Jalan Bukit Kukus, Paya Terubong, near here has been identified as among the cause of the landslide.

Azhari Ahmad, who is Mineral and Geoscience Department (JMG) director for Perlis, Kedah and Penang, said the finding was made based on its inspection and monitoring since Saturday.

“The JMG team identified several factors that caused the landslide, resulting in all containers on the hill slope to slide down with the earth.

“The main factor that caused the landslide is the water flow from a stream near the slope and heavy rain since Friday morning caused the water to overflow,” he told reporters yesterday.

Azhari said the department had taken immediate measure by diverting the flow of water from the stream elsewhere to avoid worsening the situation, especially during the search and rescue (SAR) operation.

He said further inspection conducted at 7.30am yesterday found the water flow on the slope was lesser but the department would continue to monitor the situa­tion with equipment from the Special Malaysia Disaster Assistance and Rescue Team to ensure the safety of SAR personnel.

He said based on observation and inspection at the scene, the department found the location of the landslide to be at the concave slope which easily collected water.

“But we do not rule out the possibility of a follow-up landslide in the area due to the soil structure and there is still water flowing that can cause landslide.

“We have also advised the rescue team to stop operation immediately if it rains as it could cause another landslide,” he said.

Azhari said the department was assisting the rescue team in the SAR operation and did not rule out the possibility of it conducting further investigation to determine the ac­­tual cause of the landslide.

“We hope for fine weather and no rain so that the SAR operation can be continued until all the victims are found,” he said.

The landslide occurred at about 1.30pm last Friday.

The tragedy occurred following heavy rain in the state from Thurs­day afternoon until noon the following day, causing the landslide at the container and kongsi area at the Bukit Kukus paired road construction site.

Source: Bernama, Reports by LO TERN CHERN, N.TRISHA and R.SEKARAN



Related stories:

 

Zairil: Contractor to face action if accident due to negligence - Metro

 


Wake up and stop the landslides, state govt urged - Nation



Wake up and stop the landslides, state govt urged - Nation

 


DOSH: Builders told to stop work, but did not - Nation

 


CAP urges Penang govt to issue stop work order on hillside



October and November turning into ‘disaster season’


‘Put safety measures into place at construction sites’

 

 

Related post:

 

Precarious situation: The collapsed beams along Jalan Tun Sardon which fell and broke after being knocked down. https://www.thestar.c